Renovation | |
since 12. 2023
May 2024
This week, the painters put down their brushes. The walls of the medium-sized hall have been painted red, based on the historical model of Mary Wigman's work. Despite its current unfinished state, the room already radiates the spirit of the 1920s and the inspiration of the interconnection of the arts with its intense color scheme.
Next week, the installation of the professional dance floor will begin, and in addition to the installation of a mirror wall, the restoration of original color pigments on a selected wall surface by restorer Sonja Kaeten is also planned. The suspended ceiling will have to wait a little longer, but soon it will be possible to work artistically in this hall with its restored atmosphere.
Renovation work on the Red Hall, status: May 2024
Renovation work on the Red Hall, status: May 2024
Renovation work on the Red Hall, status: May 2024
If you would like to support us in the next steps of renovating the Red Hall, we welcome any donation, large or small, via bank transfer.
Villa Wigman für Tanz e.V.
IBAN DE52 4306 0967 1191 7607 00
BIC GENODEM1GLS (GLS Bank)
or via
We will gladly issue you a donation receipt.
Please contact us at gl(at)villawigman.de.
February 2024
The floor was demolished, except for the wooden beams that had been preserved from the construction period. Structural, fire protection, and thermal insulation requirements made a complete rebuild necessary. In order to preserve the original wooden beams while still ensuring the maximum future height of the floor structure, the beams were lowered by approximately 12 cm. The renovation also included the installation of underfloor heating and a professional dance floor.
Renovation work on the Red Hall, status: February 2024
Renovation work on the Red Hall, status: February 2024
Renovation work on the Red Hall, status: February 2024
Renovation work on the Red Hall, status: February 2024
Renovation work on the Red Hall, status: February 2024
December 2023
On December 15, 2023, a new phase of renovation began at villa\wigman. The interior walls and floor of the so-called Red Hall are currently being renovated. The floor will be completely demolished, rebuilt from the basement up, and then fitted with underfloor heating and a sprung floor. Furthermore, the dilapidated plaster on the interior walls will be repaired, mineral plaster will be applied, electrical cables will be re-laid, and a coat of paint will be applied that brings the historic red color back to life. For this purpose, partial areas will be restored.
Wigman later recalls in an interview: (Mary Wigman, p. 76, Hedwig Müller)
“First of all, everything had to be painted. And since we were living in the Expressionist era at the time, it was only natural that my desire for color was satisfied. So, the practice room in the house was bright red! Walls, ceiling, doors, everything except the floor was bright red! ... My bedroom was gold... Black with gold.”
Foto: © Katja Erfurth
Foto: © Katja Erfurth
Foto: © Katja Erfurth
|
↑ |
|
Donate for a moved future!
Support the running of villa\wigman and the renovation of a historic monument. We are happy to issue a donation receipt on request. Thanks a lot! |
Donate with Paypal |
DE52 4306 0967 1191 7607 00 GENODEM1GLS (GLS-Bank) |
Contact |
Room request | Location | Contacts |
× Hide list
Management Josefine Wosahlo
|
Management team Katja Erfurth
|
Management team Julia Amme
|
PR Frieda Pirnbaum
|
Technology Heinrich Häußler
|
|
↑ |
|
Donate for a moved future!
Support the running of villa\wigman and the renovation of a historic monument. We are happy to issue a donation receipt on request. Thanks a lot! |
Donate with Paypal |
DE52 4306 0967 1191 7607 00 GENODEM1GLS (GLS-Bank) |
Contact |
Room request Location Contacts |
Management Josefine Wosahlo
|
Management team Katja Erfurth
|
Management team Julia Amme
|
PR Frieda Pirnbaum
|
Technology Heinrich Häußler
|